Oakman Elementary was constructed in 1927 and sits on 3.5 acres of land.
Under the 2026 transformational bond, Oakman Elementary students would be moved to McCollough-Unis School. This would provide those students with more equitable education by allowing access to services such as a full-time music teacher. For an overview of the plan, see the one-page McCollough-Unis flyer.
Oakman Elementary School would be kept for future program needs in the district.
Phase 1 (Years one to five)
- Secure vestibule/reception at Oakman
Phase 4 (Years 15 to 20)
McCollough-Unis would see extensive renovations, including
- Major renovations to classrooms, media center, gym, and pool
- Cafeteria and kitchen upgrades
- Site improvements including parking, and outdoor spaces
- Athletics including turf field and walking track
- Major mechanical replacement
- Building enclosure such as roofing, windows, doors
- Major electrical replacement
- Major plumbing replacement
- Elevator replacement
About PK-8 schools
Creating preschool-through eighth grade buildings will allow students and families to form strong bonds while remaining in their neighborhood school for much longer. Elementary and middle school students would be separated for classes, meals, recess, lineup, and dismissal, but all students could use special spaces like STEM labs, music rooms, and gymnasium-auditoriums. An ADA accessible pool would also be included and a turf athletic field.
Students and families would benefit from staying in the same neighborhood school for up to 10 years – from free GSRP preschool through eighth grade.
Learn more about the 2026 transformational bond on the district website.



